Johnson Controls Canada
Detail excavation, backfill and prep for new concrete slab on grades at three locations within University of Alberta Campus. These were to house the new Cogen units supplied by Johnson Controls.
Check out the Construction Achievement summary by clicking on image to the left.
These were our first projects with Johnson Controls, and was to assist with their role out of Cogen units across Alberta at numerous locations. All locations had winter conditions, thus requiring heating & hoarding to maintain necessary curing standards.
Comments